Risk Assessments and Safety Studies

ESR’s Safety and Risk Management business is focused on the delivery of safety and risk solutions that will benefit your organisation. Through the delivery of thousands of risk-based studies for clients, we have developed skills and software for risk assessment that help businesses remain safe and profitable.

Our expertise covers all aspects of Risk Assessment including:

  • Quantitative Risk Assessment (QRA) for both onshore and offshore facilities
  • Consequence Analysis (Including CFD)
  • Major Hazard Safety Studies (EERA, ESSA, Dropped Objects,  PFEER)
  • Fire Safety Support for Buildings, as per Fire Safety Order (2005)
  • Fire and Explosion Risk Assessments (FERA)
  • Toxic and Flammable Gas Ingress Assessment
  • Hazard Identification (HAZIDs, HAZOPs)
  • Frequency Analysis (Fault and Event Tree Analysis, Parts Count)
  • Occupied Building Risk Assessments (OBRA)
  • Failure Modes and Effects Analysis (FMEA)
  • ALARP demonstration and cost-benefit analysis
  • Business Risk Management
  • SIMOPs and COMOPs Risk Assessment
An offshore platform

A selection of our recent project experience

01/ Onshore Facilities

LNG Facility – QRA, FERA and Toxic gas Ingress Analysis for the world’s largest LNG Trains during the EPC project phase

Hydrogen Electrolysers – QRA for a new 10MW electrolyser project situated at an existing COMAH facility

Oil Refinery QRA and OBRA – Combined QRA and OBRA for a Upper-tier COMAH Refinery assessing a broad range of MAH including toxic Hydrogen Fluoride risks associated with an Alkylation Unit

Gas Terminal SIMOPs QRA – Assessment of the societal risks associated with SIMOPs construction adjacent to an operational gas terminal

Metal Refinery QRA and ERA – Assessment of the unique toxic hazards to people and the environment associated with metal refining

02/ Offshore Facilities

Offshore QRA and Safety Studies for a Super Complex –  Safety studies (QRA, FERA, EERA, ESSA etc) for a middle east Offshore Super Complex during EPC

North Sea Operator Walk to Work Support – Supporting a duty holder with a Regulation 24 Safety Case Material Change for walk-to-work operation, HAZID and Bow-Tie workshops, and a walk-to-work risk assessment

North Sea Oil and Gas Duty Holder PFEER Regulation 5 Assessments – Comprehensive PFEER Regulation 5 assessments for eight North Sea installations over a period of approximately six months

Dismantling Safety Case Support –  A series of safety studies in support of a North Sea decommissioning project including EERA, collision risk, personnel transfer ALARP assessment and development of Performance Standards

Vessel Engulfment Study – Modelling to assess the impact of removing passive fire protection from pressure vessels on a North Sea production installation

 

LNG Facility – QRA, FERA and Toxic gas Ingress Analysis for the world’s largest LNG Trains during the EPC project phase

Hydrogen Electrolysers – QRA for a new 10MW electrolyser project situated at an existing COMAH facility

Oil Refinery QRA and OBRA – Combined QRA and OBRA for a Upper-tier COMAH Refinery assessing a broad range of MAH including toxic Hydrogen Fluoride risks associated with an Alkylation Unit

Gas Terminal SIMOPs QRA – Assessment of the societal risks associated with SIMOPs construction adjacent to an operational gas terminal

Metal Refinery QRA and ERA – Assessment of the unique toxic hazards to people and the environment associated with metal refining

Offshore QRA and Safety Studies for a Super Complex –  Safety studies (QRA, FERA, EERA, ESSA etc) for a middle east Offshore Super Complex during EPC

North Sea Operator Walk to Work Support – Supporting a duty holder with a Regulation 24 Safety Case Material Change for walk-to-work operation, HAZID and Bow-Tie workshops, and a walk-to-work risk assessment

North Sea Oil and Gas Duty Holder PFEER Regulation 5 Assessments – Comprehensive PFEER Regulation 5 assessments for eight North Sea installations over a period of approximately six months

Dismantling Safety Case Support –  A series of safety studies in support of a North Sea decommissioning project including EERA, collision risk, personnel transfer ALARP assessment and development of Performance Standards

Vessel Engulfment Study – Modelling to assess the impact of removing passive fire protection from pressure vessels on a North Sea production installation